Hello Dear Folks, if you are looking for SAP C_TS422_2021 Dumps | C_TS422_2021 Exam with Answers | C_TS422_2021 Multiple Choice Questions with Answers | C_TS422_2021 SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing Dumps then you will get all the answers here in this blog post.
Question. 1
What is the purpose of collective orders?
A. To post any component withdrawal as single backflush with order confirmation
B. To manage production orders for an entire finished product on multiple levels
C. To combine order management of co-products and by-products with the main product
D. To post production costs on a cost collector instead of the production order
Answers B
Question. 2
You use planning strategy Finite Scheduling – with Reverse and want to allow scheduling in the past.
How can you parameterize this in the strategy profile?
A. Specify a positive planning horizon.
B. Specify a negative planning horizon.
C. Specify a negative offset time.
D. Specify a positive offset time.
Answers C
Question. 3
Your production planners must execute planning only for specific resources. How can you achieve
this in Advanced Planning (PP/DS)?
A. Use a resource group.
B. Use a planning group.
C. Use a propagation range.
D. Use a planning area.
Answers A
Question. 4
Which of the following automation options can you use for production orders? Note: There are 2 correct answers to this question.
A. You can use trigger points to automatically create rework orders via confirmations.
B. You can use mass processing to set production orders to technically complete.
C. You can use the production scheduling profile to automatically set orders to technically complete.
D. You can use mass processing to read PP master data for production orders.
Answers A B
Question. 5
How can you set up the supply source for the Kanban process in SAP S/4HANA? Note: There are 3 correct answers to this question.
A. Use purchase orders for external procurement.
B. Use stock transfer reservations for stock transfer.
C. Use purchasing costs for automated source prioritization.
D. Use quotations for internal and external procurement.
E. Use run schedule quantities for in-house production.
Answers A B E
Question. 6
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers to this question.
A. Add the agreement to the source list and mark it for MRP relevance.
B. Add the agreement to the quota arrangement and mark it for MRP relevance.
C. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
D. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
Answers A D
Question. 7
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.
A. Execute an infinite production planning run for the critical resources.
B. Increase the capacity supply in a time-phased interval.
C. Reduce the planning window.
D. Form optimum sequences to reduce setup times.
E. Determine a time period with available capacity on the planning board.
Answers B D E
Question. 8
What will happen in the MRP run if you have created a new MRP-relevant material that supports both in-house production and external procurement?
A. The MRP run assumes in-house production.
B. The MRP run assumes external procurement.
C. The MRP run plans the material only if a quotation has been maintained.D. The MRP run does NOT consider the material; it has to be planned interactively.
Answers A B
Question. 9
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question
A. In the routing
B. In the work centers
C. In the bill of material (BOM)
D. In the production version
E. In the MRP controller
Answers A C D
Question. 10
What are some benefits of planning with planned independent requirements? Note: There are 2 correct answers to this question.
A. Reduced delivery times
B. Option to use make-to-order production
C. Reduced production times
D. Option to forecast planning for production resources
Answers A C
Question. 11
What can you use heuristics in Advanced Planning (PP/DS) for?
A. To automate material movements in material staging
B. To set default values in production master data
C. To optimize costs and times in production plans
D. To solve planning problems for defined objects
Answers D
Question. 12
For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.
A. The assigned routing must be a rate routing.
B. The assigned routing must NOT have alternative sequences.
C. The assigned routing and bill of material (BOM) must be valid in the entire validity period.
D. The lot size range must be within the lot size range of the assigned routing.
E. The deletion flag must NOT be set for the bill of material (BOM) or the routing.
Answers B C E
Question. 13
Which time elements can be reduced by a reduction strategy? Note: There are 3 correct answers to this question.
A. Wait time
B. Goods receipt processing time
C. Move time
D. Queue time
E. Float after production
Answers A C D
Question. 14
You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The desired dispatching time coincides with an operation that has
previously been dispatched. How does the insertion take place?
A. The new operation is inserted at the desired time; the previously dispatched operation is moved
forward.
B. The previously dispatched operation stays as is; the new operation is inserted before the
dispatched operation.
C. The previously dispatched operation stays as is; the new operation is inserted after the dispatched
operation.
D. The new operation is inserted at the desired time; the previously dispatched operation is moved
backward.
Answers D
Question. 15
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.
A. To determine the work in progress along the production line
B. To stage different components for a production line simultaneously
C. To provide timely updates of inventory management for the staged components
D. To reduce the total production lead time for a long production line
Answers A C
Question. 16 In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run? Note: There are 2 correct answers to this question.
A. Use a specific material status.
B. Use a specific material group.
C. Use a specific MRP type.
D. Use a specific MRP list.
Answers A C
Question. 17
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.
A. Past quotation quantities
B. Past sales order quantities
C. Market intelligence
D. Past production planning quantities
E. One-off events
Answers B C E
Question. 18
What is a work center hierarchy in capacity planning?
A. A group of work centers in a parallel sequence that is used to split production quantities and work
on them in parallel
B. A group of alternative work centers for production, structured in hierarchy levels by priorities
C. A group of alternative work centers providing a cumulative available capacity for production
D. A group of work centers in a production line being used in sequence for production
Answers C
Question. 19
Which of the following elements does MRP take into account during net requirement calculation?
Note: There are 2 correct answers to this question.
A. Forecast key figures
B. Safety stock
C. Purchase orders
D. Maximum stock level
Answers A B
Question. 20
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.
A. Assign the overall profile to the authorization profile.
B. Create an object selection variant for priority-category-related alerts
C. Create an object selection variant for production-planning-related alerts.
D. Assign the alert profile to the overall profile.
Answers C D
Question. 21
Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the Advanced Planning flag? Note: There are 2 correct answers to this question.
A. Plant
B. Work center
C. Material
D. Production version
Answers B C
Question. 22
What could be the reason for multiple commitments, where several operations have the same scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this question.
A. The Finite Scheduling indicator is NOT set in the strategy profile.
B. The work center has several individual capacities.
C. Alternative work centers are fully occupied.
D. The Change Planning Direction indicator is set in the strategy profile.
Answers A B
Question. 23
When can consumption of planned independent requirements take place for planning strategy 40 (Planning with final assembly)?
A. When you create a sales order
B. When you deliver a sales order
C. When MRP creates a planned order
D. When MRP creates a dependent requirement
Answers A
Question. 24
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.
A. Posting of goods receipt for the product
B. Reduction of associated capacity requirements
C. Material staging for next order in sequence
D. Archiving of documents for assembly scrap
E. Posting of production costs to the production cost collector
Answers A B E
Question. 25
In documentation for MRP in Advanced Planning, you read that new orders are created through infinite planning. What does this mean for the capacity requirements of a new order?
A. MRP creates the capacity requirements without checking the work center capacities.
B. MRP assigns the capacity requirements automatically to work centers with the earliest available
capacity.
C. MRP creates the capacity requirements only if the work center has sufficient capacity.
D. MRP assigns the capacity requirements automatically after the last scheduled order on a work
center.
Answers A
Question. 26
You want to use capacity availability checks for production orders. Which settings have to be made for this? Note: There are 2 correct answers to this question.
A. A checking rule must be assigned to the work centers.
B. An overall profile must be assigned in the checking control.
C. The scope of check must be defined in Customizing.
D. The Relevant for Finite Scheduling indicator must be set.
Answers B D
Question. 27
Your company manufactures materials whose specifications differ for each manufacturing process. Which application do you have to use in SAP S/4HANA to be able to track and use this information in all areas of logistics?
A. Batch management
B. Quality management
C. Process order management
D. Engineering change management
Answers A
Question. 28
Which SAP applications can be used for forecasting in Supply Chain Planning? Note: There are 2 correct answers to this question.
A. Capacity Requirements Planning (CRP)
B. Supply Chain Management (SCM)
C. Integrated Business Planning (IBP)
D. Material Requirements Planning (MRP)
Answers B C
Question. 29
Which options do you have to plan both quantities and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.
A. Run MRP with automatic selection of production version.
B. Run MRP with quota arrangement.
C. Assign planned orders manually in the planning table.
D. Run PP/DS heuristics for repetitive manufacturing.
Answers B D
Question. 30
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
A. Fill up to the safety stock level.
B. Fill up based on the lot size procedure.
C. Fill up to the reorder stock level.
D. Fill up to the maximum stock level.
Answers B
Question. 31
Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA? Note: There are 2 correct answers to this question.
A. Manual maintenance
B. Simultaneous
C. 100% check
D. First in first out (FIFO)
Answers A C
Question. 32
Which master data object governs the relationship between supply source and demand source in the Kanban process?
A. Production supply area
B. Rate routing
C. Replenishment strategy
D. Control cycle
Answers D
Question. 33
You want to create a production order. What methods can you use? Note: There are 2 correct answers to this question.
A. Create without material
B. Convert a purchase requisition
C. Create in Kanban process
D. Create by order release
Answers A C
Question. 34
How would you define pegging in the context of Advanced Planning?
A. An evaluation to verify if there are overstock situations in the balance between receipt and issue
elements after the production planning run
B. An evaluation that is ordered according to the network structure of all related products and
represents the coverage of issue elements with receipt elements
C. An evaluation that is ordered according to the bill-of-material structure of all related products and
represents the relationship between the receipt and the issue elements
D. An evaluation to verify if there are material or capacity shortages in the network after the
production planning run
Answers C
Question. 35
You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
A. Make-to-order production (20)
B. Planning with final assembly (40)
C. Planning at assembly level (70)
D. Production by lot size (30)
Answers C
Question. 36
How can you characterize dependent requirements in material requirements planning? Note: There are 2 correct answers to this question.
A. They are created when an independent requirement is created for the finished product.
B. They are only created for multilevel bill of material (BOM) structures.
C. They are created on assembly level during the planning run.
D. They are created with exact times in Advanced Planning.
Answers A C
Question. 37
What do you need to consider when working with material master numbering in SAP S/4HANA?
Note: There are 2 correct answers to this question.
A. The maximum material number length is 40 for external numbers and 18 for internal numbers.
B. Material numbering is defined at client level.
C. The maximum material number length is 18 for external numbers and 18 for internal numbers.
D. Material numbering is defined cross-client.
Answers A B
Question. 38
You need to model goods receipt processing time in detailed scheduling. Which modeling options do you have? Note: There are 3 correct answers to this question.
A. Model a separate inbound resource in the location master.
B. Model a separate resource in the production data structure.
C. Model a goods receipt time in the material master.
D. Model a transportation lane and carrier selection in the location master.
E. Model a handling resource in the location master.
Answers C D E
Question. 39 Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.
A. Non-stock item
B. Work item
C. Variable-size item
D. WBS item
Answers A C
Question. 40
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note: There are 2 correct answers to this question.
A. Total replenishment lead time
B. Planned delivery time
C. In-house production time
D. Operation duration
Answers B C
Question. 41
What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question.
A. Scheduling agreement schedule line
B. Planned order
C. Purchase order
D. Production order
Answers A B
Question. 42
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.
A. To reduce the number of material masters
B. To make the assignment of components easier
C. To increase the number of planning levels
D. To reduce the number of changes required in bills of material
E. To simplify the structure of bills of material
Answers B D E
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?
A. Backflushing
B. Kanban
C. Material requirements planning
D. Production order release
Answers C
Question. 44
Which materials have a negative quantity in a bill of material or in a recipe? Note: There are 3 correct answers to this question.
A. Continuous flow materials
B. Co-products
C. Waste products
D. Bulk materials
E. By-products
Answers B C E
Question. 45
Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA. When can you use mode selection?
A. When alternative resources are used within one operation
B. When multiple production versions are maintained for one product
C. When multiple operations are maintained for one product
D. When multiple planned orders exist on one resource
Answers A
Question. 46
Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question.
A. Which base unit of measure does the material have?
B. What status does the BOM have?
C. Is the material type allowed in the BOM?
D. In which storage location is the BOM required?
Answers B C
Question. 47
Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any
impact on the production program.Which planning strategy do you use?
A. Make-to-order production (20)
B. Planning without final assembly (50)
C. Make-to-stock production (10)
D. Planning with final assembly (40)
Answers D
Question. 48
Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.
A. Routing
B. Work center
C. Bill of material (BOM)
D. Material master
Answers A
Question. 49
What data can you maintain in the subitems of a bill of material (BOM)? Note: There are 2 correct answers to this question.
A. Scrap percentage
B. Installation point
C. Quantity
D. Item type
Answers B C
Question. 50
During production order creation, several valid production versions are found. How does the system choose the production version?
A. Planned order or material number
B. Validity period or sales order
C. Lot size or material cost
D. Alphanumeric or quota arrangement
Answers B
Question. 51
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.
A. Changing the stock in inventory management
B. Changing the procurement type in the product master
C. Changing the purchasing contract in materials management
D. Changing the operation times in the production data structure
E. Changing the storage bin in warehouse management
Answers A B C
Question. 52
You are trying to create a production order and NO valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question.
A. The order lot size is NOT within the validity range of a production version.
B. All production versions for the material are locked.
C. NO bills of material (BOMs) are assigned to the production versions.
D. NO production lines are assigned to the production versions.
Answers A B
Question. 53
What could be the reason for different combinations of components in a multiple bill of material (BOM)? Note: There are 2 correct answers to this question.
A. BOM header status
B. BOM item status
C. Lot size
D. Manufacturing date
Answers C D
Question. 54
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.
A. By plant
B. By material status
C. By period
D. By industry
Answers A C
Question. 55
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.
A. Production orders are created with sales order reference.
B. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.
C. Net requirements calculation is carried out for every sales order individually.
D. Storage location MRP areas are required for sales-order-specific stock.
E. Both the reduction of make-to-order stock and requirements occur on delivery.
Answers A B C
Question. 56
Which information is required when you create a product master in SAP S/4HANA? Note: There are 2 correct answers to this question.
A. Product type
B. Selection screen for plants
C. Selection screen for views
D. Base unit of measure
Answers A D
Question. 57
You want to reduce planning efforts for B and C materials. Which planning procedure do you recommend?
A. Manual Planning Without Check
B. Advanced Planning
C. Material Requirements Planning
D. Consumption-Based Planning
Answers D
Question. 58
Where do you maintain the work center that represents the production line for repetitive manufacturing? Note: There are 2 correct answers to this question.
A. Production cost collector
B. Production version
C. Repetitive manufacturing profileD. Routing
Answers B D
Question. 59
What time element of midpoint scheduled operations can be reduced by reduction strategy settings while dispatching? Note: There are 2 correct answers to this question.
A. Setup time
B. Queue time
C. Teardown time
D. Move time
Answers B D
Question. 60
Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material? Note: There are 2 correct answers to this question.
A. Procurement type
B. MRP type
C. MRP group
D. Material type
Answers A D
Question. 61
What does the material type influence? Note: There are 2 correct answers to this question.
A. Which document types and class categories are allowed
B. Which material master screens appear and in which sequence
C. Which plant-specific and plant-independent statuses are allowed
D. Whether the material is produced in-house, procured externally, or both
Answers A B
Question. 62
What does a line hierarchy in repetitive manufacturing represent?
A. A production line with a parallel sequence in the routing
B. A production line with an alternative sequence in the routing
C. A production line with prioritized alternative work centers
D. A production line with more than one work center
Answers D
Question. 63
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA?
Note: There are 2 correct answers to this question.
A. Orders (dispatched) chart
B. Capacity requirements chart
C. Order (pool) chart
D. Work center capacities chart
Answers B D
Question. 64
Which business processes are affected by settings in the order-type-dependent parameters?Note: There are 2 correct answers to this question.
A. Define integration with cost accounting.
B. Check material availability.
C. Select master data.
D. Schedule production orders
Answers A C
Question. 65
How can you support a GMP (Good Manufacturing Practice)-compliant production process? Note: There are 3 correct answers to this question.
A. Approved resources
B. Recipe approval
C. Batch record
D. Digital signature
E. GMP-compliant flag
Answers A C
Question. 66
What is the difference between co-products and by-products?
A. Only co-products have a zero inventory valuation.
B. Only co-products are identified by a special item category in the bill of material (BOM).
C. Only co-products appear in the process or production order settlement rule.
D. Only co-products can be manufactured in isolation from the main product.
Answers C
Question. 67
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production.How can you identify all affected finished goods stocks? Note: There are 2 correct answers to this question.
A. Use batch derivation.
B. Use batch determination.
C. Use the batch where-used list.
D. Use the Batch Information Cockpit.
Answers D
Question. 68
You want to set up a make-to-order planning scenario for a finished material. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is
NOT possible. Which settings do you make to achieve this?
A. Choose planning strategy 50 (Planning without final assembly) and select the corresponding
Mixed MRP indicator.
B. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator.
C. Choose planning strategy 50 (Planning without final assembly) and select the corresponding
Individual/Collective indicator.
D. Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective
indicator.
Answers C
Question. 69
What are the options if the Dispatched operation status is set for a production order operation?
Note: There are 2 correct answers to this question.
A. You can reschedule the operation using midpoint scheduling in a planning table.
B. You can reschedule the operation in the Manage Production Operations app.
C. You can reschedule the operation using finite scheduling in a planning table.
D. You can reschedule the operation using infinite scheduling in a planning table
Answers C
Question. 70
How can you set up a material as a phantom assembly? Note: There are 2 correct answers to this question.
A. Change the item category of the phantom assembly in the bill of material (BOM).
B. Define the special procurement type inside the BOM.
C. Change the phantom item indicator for the phantom assembly in the bill of material (BOM).
D. Define the special procurement type inside the material master.
Answers C D
Question. 71
What determines whether the planned independent requirements in demand management are consumed by other requirements? Note: There are 2 correct answers to this question.
A. Requirements type
B. Order type
C. Planning strategy
D. Requirements profile
Answers A
Question. 72
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?
A. The planned order’s components are copied to the picking list.
B. The planned order is converted to a production order.
C. The planned order generates capacity requirements.
D. The planned order’s component availability is checked.
Answers C
Question. 73
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note: There are 2 correct answers to this question.
A. Resource network
B. Resource hierarchy
C. Resource matrix
D. Resource selection
Answers A B
Question. 74
For production orders, cost object controlling (COC) can be carried out on an order-related or product-related basis. Which of the following do you have to consider? Note: There are 2 correct answers to this question.
A. Order-related COC is beneficial in a flexible production environment.
B. Product-related COC is used in manufacturing for co-products.
C. In order-related COC, individual production orders do NOT have cost segments.
D. In product-related COC, all costs are debited and credited to a product cost collector.
Answers A D
Question. 75
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.
A. Queue time
B. Pick/pack time
C. Setup time
D. Move time
E. Float before production
Answers C D
Question. 76
How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question.
A. By order release
B. By capacity planning
C. By mass processing
D. By order confirmation
Answers A C
Question. 77
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?
A. Squeeze in
B. Insert operation
C. Find slot
D. Schedule in working time only
Answers C
Question. 78 Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question.
A. Setup time
B. Opening period
C. Total replenishment lead time
D. Float after production
Answers A D
Question. 79
In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.
A. Planning mode
B. Finiteness level
C. Fixed pegging
D. Direction
E. Scheduling control
Answers A D E
Question. 80
Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question.
A. The same base unit of measure is used.
B. The quantity and value updates are the same.
C. The same batch management level is used.
D. The same account category is used.
Answers B D