What determines the sequence in which materials are planned during the material requirements planning (MRP) run?

A.  The low-level code of the materials

B.  The control parameters of the MRP run

C.  The replenishment lead time of the materials

D.  The creation date of the materials
closed

1 Answer

0 votes
by (0 points)
 
Best answer
A